

Our company undertook the subcontracting works mainly including cleanroom decoration, process water system, compressed air system, purified water system, oxygen supply system, constant exhaust system and power distribution works.
Adopting an integrated distributed piping design and construction mode throughout the project, the project passed the acceptance inspection at one time by the French headquarters and was highly recognized by the owner.
