
Phase I Tissue Culture Center of Yunnan Lvjulong Biotechnology Co., Ltd. adopts the EPC general contracting model with integrated design, procurement and construction. The construction area of Phase I is approximately 5,000 square meters, featuring advanced design concepts for modern tissue culture purification systems.
The professional works cover purification decoration, HVAC, power distribution, automatic control systems, fire protection, water supply and drainage engineering, as well as greenhouse heating system engineering (the greenhouse covers a construction area of about 11,000 square meters). The project passed acceptance inspection and was officially put into operation in 2021.
The professional works cover purification decoration, HVAC, power distribution, automatic control systems, fire protection, water supply and drainage engineering, as well as greenhouse heating system engineering (the greenhouse covers a construction area of about 11,000 square meters). The project passed acceptance inspection and was officially put into operation in 2021.
