CN
133-8250-9160

Phase II Decoration Project of Tissue Culture Laboratory, Ordos, Inner Mongolia

Adopting the EPC general contracting model, the professional works include purification decoration engineering, HVAC engineering, electrical engineering and water supply & drainage engineering. The project passed acceptance and was put into operation in December 2022.

Previous:Phase II Decoration Project of Shandong Phalaenopsis Flower Tissue Culture Laboratory

Next:Integrated Design & Construction Project for Purification and Decoration of Phalaenopsis Tissue Culture Laboratory in Shuyang, Suqian